PRODUCT LIST
-
Edible Oil Plant Project
-
Biodiesel Plant Project
-
Skid-Mounted Biodiesel Unit
-
POME/UCO Treatment System
HOT PRODUCTS
100000 TPY Used Cooking Oil Turnkey Biodiesel Project in Shandong
jiuda2024/11/08
Basic parameter
Scale:100000ton per year
Raw material: Used cooking oil(UCO),waste oil,acid oil,palm acid oil
Project time: 2012
Factory sucessful running :
Please click the Youtube:
Process:
1.Pretreatment (remove water and contaminants)
2.Esterification ( remove FFA)
3.Methanol distillation (recover methanol)
4.Transesterification (produce biodiesel)
5.Methyl Ester distillation(refine Methyl Ester)
6.Glycerination(recover oil)
First of all,water,particles and phospholipids are removed at the stage of pre-treatment.At the stage of esterification,free fatty acids are converted into fatty acid methyl esters. Then refined oil is reacted with methanol using a hydroxide catalyst in a single-stage process yielding fatty acid methyl esters. After removal of excess methanol, the crude methyl ester is settled to remove the co-product glycerol. Following sedimentation, the ester is vacuum distilled, which removes catalyst residues, free glycerin, and other undesirable products soluble in the ester. After distillation, biodiesel is discharged to storage.
In 2012, our company signed a general contract with Shandong Bioenergy Co., Ltd. for a biodiesel project with an annual output of 10,000 tons. The main raw materials are Used cooking oil(UCO),waste oil,acid oil,palm acid oil. The main project includes a set of biodiesel production equipment and living and office facilities. The relevant regulations of the state or industry will be strictly implemented from design to production in environmental protection and labor safety. The production process fully considers the control and comprehensive treatment of pollution, and the whole construction period does not cause new pollution to the environment. The product-biodiesel can meet the EU standards,American standards.